Villa owners planning an autumn garden installation need a briefing checklist that connects outdoor planting to indoor finishes. Solomia Design delivers luxury interiors turnkey across the UAE and plans the indoor-outdoor threshold together with the garden; the studio brings 17 years of practice, more than 200 turnkey projects and six International Property Awards to that threshold.
Autumn is when many villa owners start planting, so settle the garden and interior briefs now. Agreeing levels, drainage paths and materials with the landscape contractor and the interior designer together prevents mismatched floor heights where sliding glass doors meet exterior paving.
- Specify the irrigation hardware by model, flow and operating pressure before you compare quotes.
- Ask for the planting list to show which species are native or adapted, because Dubai rules set a minimum share for new buildings.
- Fix emitter counts for every tree, with a written plan to add emitters as the canopy grows.
- Have the contractor and the interior designer sign the same threshold level and paving material.
What does October weather mean for planting day?
October conditions still stress new plants. The National Centre of Meteorology’s Dubai bulletin for 23 October 2026 forecast a maximum of 38°C and a minimum of 26°C, with humidity between 40 and 90 per cent. Ask the contractor to plant in the cooler hours and water in every plant on the day.
Humid nights and mornings, with fog or mist possible, do not replace irrigation. Roots still need a scheduled supply while the weather cools, so the controller programme belongs in the brief from the first meeting.
Which plants should the planting list name?
Dubai Municipality’s green building regulations, published through the UAE government portal, require at least 25 per cent of the planted area of a new building plot to use species indigenous or adapted to Dubai’s climate, and at least one palm tree for every new villa. Ask the contractor to mark each species on the planting list as native, adapted or ornamental, and to state where the stock was grown.
Dubai Municipality’s Greenery and Plantation Manual 2026, launched on 3 September 2026, covers sustainable irrigation, water-efficient design and native and adaptive species for public green spaces, so it shows the standard the city now applies to its own landscapes. The ghaf is the obvious anchor tree: the Environment Agency Abu Dhabi describes it as drought tolerant and the UAE national tree since 2008. Our notes on Dubai garden soil tests and salinity results explain which readings should alter the planting plan.

What irrigation details belong in the landscaping brief?
Name the dripline, not just the word drip. Rain Bird lists its PCD pressure-compensating dripline at 2.3 litres an hour per emitter, an operating pressure of 0.58 to 4.14 bar, 120 mesh filtration, emitters every 33 centimetres, and water up to 37.8°C with ambient air up to 51.7°C.
Hardware is only half of it. Utah State University Extension reports that trees and shrubs commonly die three to four years after planting when emitters are not increased as the plants grow, and that sprinkler and drip lines need separate valves. Ask how many emitters each tree gets at planting, when more will be added, and which valve serves which zone. Review our checklist for Dubai villa irrigation zones before approving a layout.
What should the briefing checklist contain?
Use the table as a reference sheet when you brief the landscaping firm and compare their written responses. Each row names the detail that should appear in the contract drawings or the specification, so a missing answer is visible before work starts.
| Item | What to specify | Source |
|---|---|---|
| Native and adapted planting | At least 25 per cent of the planted area in species indigenous or adapted to Dubai, and at least one palm for a new villa | Dubai Municipality green building regulations |
| Planting list | Each species marked native, adapted or ornamental, with the nursery that grew it | Dubai Municipality Greenery and Plantation Manual 2026 |
| Dripline | Model, 2.3 litres an hour per emitter, 33 centimetres spacing, 0.58 to 4.14 bar, 120 mesh filter | Rain Bird PCD specification |
| Tree emitters | Spot emitter model and flow rate for each tree, with a written emitter count per tree | Utah State University Extension |
| Heat tolerance | Pipe rated for water to 37.8°C and ambient air to 51.7°C | Rain Bird PCD specification |
| Valves and zones | Separate valves for sprinkler and drip lines | Utah State University Extension |
| Emitter increase | Dated plan to add emitters as the canopy grows | Utah State University Extension |
| Planting window | Cooler hours, watering-in on the day, for highs near 38°C and humidity of 40 to 90 per cent | NCM Dubai bulletin, 23 October 2026 |
How should the garden brief connect to the interior design?
The transition between air-conditioned living spaces and exterior terraces dictates how often residents use their gardens. Paving materials must align with interior flooring heights to avoid trip hazards at sliding door tracks. Agree the paving material and its finished level with both teams before either orders stock.
Coordinating the landscape architect with the interior designer ensures that pergola columns align with internal structural bays and that outdoor lighting circuits integrate with smart-home controls. Our feature on how to extend quiet luxury from interiors to the garden outlines the threshold details that unify both spaces, and our guide to comparing Dubai landscaping quotes shows how to spot scope gaps before you sign.
What should you do before excavation begins?
Send the checklist to every firm you invite to quote, and ask for a written answer to each row with a model number, a quantity or a drawing reference. Hold the chosen contractor to the planting list and the emitter plan in the contract, and keep the interior designer in the loop on levels and materials.